SOLUTION 3 - HIT SYSTEM AND ULTRA LOW LEAKAGE VALVES
Ultra Low Leakage valve
ULTRA LOW LEAKAGE VALVE FOR
CO2 REDUCTION AND FUEL SAVINGS
Plug n’ play solution for energy optimization
Internal leakage of control valves can cause energy losses during port stay on HT cooling system
when pre-heater is in operation and additional consumption of oil by the boiler during port stay.
Internal leakage leads to increased CO2 emissions, increased CO2 tax for the owner and worse
CII rating of the vessel.
BROEN Clorius Controls offers a broad program of control valves, designed for energy
optimization. Our unique Ultra Low Leakage valve solution has a leakage rate of less
than 0,01%.
Take control with BROEN Clorius Controls solutions
BROEN Clorius Controls offers
▪ Ultra Low Leakage valve with an internal leakage rate of less than 0,01%,
removing unwanted energy losses
▪ The Ultra Low Leakage valve can reduce the oil consumption from boilers,
reducing the CO2 emission
▪ The most compact valve on the market for easy retrofit without the need
of hot work
▪ Retrofit solution – can replace all types of 3-way valves in the market
▪ Easy installation and delivered as a plug n’ play solutions
Benefits using our valves
▪ Removes unwanted energy losses during port stay
▪ 30 – 60T fuel savings annually on most vessels
▪ No annual maintenance required
▪ Low switching cost compared to other energy optimization solutions
▪ CO2 and fuel savings
Fast Return on Investment (ROI)
UPGRADE YOUR HT COOLING SYSTEM TO REDUCE CO2 EMISSIONS AND SAVE FUEL
The maritime industry stands in front of major challenges to reach the IMO goals by 2050 and every
step counts in reducing CO2 emissions and save fuel.
With BROEN Clorius Controls Ultra Low Leakage valve solution, which can replace all 3-way valves in
the market, your vessel will be a step ahead.
During port stay, the 3 way valve will close the port to the cooler side when the engine is shutdown.
Despite the closed valve port, valves with high internal leakage will not fully prevent the water from
flowing to the cooler, leading to an unwanted cooling of the water which during port stay is heated
by the pre-heater.
With BROEN Clorius Controls Ultra Low Leakage retrofit solution, you can easily upgrade the cooling
control, and avoid energy loses during port stay, and save both oil on the boiler and lower the
Co2 emissions.
Illustration of Main Engine Jacket Water Cooling System